The upgrade of the main hospital pharmacy was carried out in phases without closing the facility.
New electrical, security, air conditioning and ventilation systems were installed including the replacement of central plant and the renewal of all the principal services within the facility.
CLIENT: Lothian University Hospitals NHS Trust ARCHITECT: Not Applicable M&E Value: £0.25m
The hospital was concerned about maintaining domestic hot water temperatures in the main system serving the kitchens and the main ward block as a precaution against Legionella. It was decided to carry out a major upgrade of the domestic hot water generation system.
A new steam main was connected to a plant room and new semi-storage steam to water generators were installed to minimise water storage and maintain flow and return temperatures above those required for the control of Legionella bacteria, a vital consideration in hospital buildings where patients are often particularly vulnerable to the disease.
Irons Foulner Consulting Engineers | 48 Melville Street | Edinburgh, EH3 7HF | T. 0131 220 0144 | F. 0131 220 0301| E.mail@ironsfoulner.co.uk